Infrastructure - Great Belt Bridge and Tunnel



Switchboards built by Logstrup. Approximately 1 km. of switchboards were supplied for the project. Highway and railway.

Draw-out MCC and distribution. Distribution of power to ventilationof tunnel, lightning of traffic lanes and pillars, and signalling for trains.